Flaneuring Calgary's original craft brewery

Long before Portland, Denver or (insert the name a city here) became the Craft Brewery Capital of North America and certainly long before Calgary’s Big Rock, Village or Wild Rose Breweries, there was Calgary Brewing and Malt Company (CB&MC) established back in 1892. Unfortunately the site on 9th Ave and 15th Street in Inglewood has been closed since 1994 and the buildings have deteriorated significantly.

 A few years back I attended a presentation by Calgary architect Lorne Simpson who also happens to be the city’s most experienced historical restoration expert on the state of the CB&MC buildings.  He has been responsible for most Calgary’s restoration projects for the past 25+ years.  The key take home message I got from his workshop was that most of the buildings were beyond restoration, pointing that many of the buildings had been added in such a way that if on was removed you had to remove several others as they were all supported each other.

While many have seen the full buffalo sculpture from 9th Avenue, this art deco style buffalo head in the middle of the site is a hidden gem. It definitely deserves to be a focal point of public space. 

This sandstone Calgary beer logo attached to the facade of this building also deserves a more prominent location with a storyboard. 

 

 

He did however off some suggestions on how the site might be developed to retain the industrial design character of those buildings while adapting them to new uses and modern building codes. While some of the audience was very disappointed that more of the site couldn’t be preserved, others were excited by the opportunity to create a unique industrial district that would keep some connection with Calgary’s past. 

 

 

My longtime mantra of linking vision with reality was put to the test for while one’s vision of a 21st century charming century brewery district with multiple 100-year-old buildings and garden with fish ponds, just didn’t jive with current economic, design and building code realities.  

This iconic buffalo has aged gracefully and it along with the previous two artifacts should be integrated to create a unique public space for the future Inglewood Brewery District (IBD). 

But seeing is believing…

For a while I have been bugging Eileen Stan, Development Program Manager, M2i Development Corporation to give me a tour.  Recently, our schedules jived and I got my wish.

I can’t believe how complex the redevelopment will be with numerous buildings scattered throughout the site making the location of major new buildings (needed to pay for the restoration) difficult.

Just one of areas where the sandstone foundation of the builiding is beginning to form mini hoodoos. 

Then there is the utilities right of way, set back from the street, CPR tracks and 17th Avenue (which use to run right through the middle of the site) to contend with.

I saw for myself how the sandstone on the buildings is “more sand than stone.” Brush it with your hand and sand pours down the side of the building, in some places, miniature hoodoos are being formed.

Inside, I saw how the building’s structure would make it difficult to convert to modern uses. Perhaps reusing materials makes more sense than repurposing the buildings.

The gardens and two buffalo sculptures were wonderful and would make a great tribute to the past. It would be lovely to somehow incorporate them into a plaza or pocket park that would be the centerpiece of a new brewery district.  

That is 17th Avenue SE which use to run right through the site and still has a utility right of way attached to it. 

Postcards from CB&MC

I am hoping that these images will help you appreciate the complexities of redeveloping the historic Calgary Brewing and Malting Company site for current uses. 

I am a sucker for "ghost signs" like this one for the The Alberta Government Fish Hatchery. Not sure how you save this wall and incorporate it into a new building/new use! I am told that it could become part of a sunny historic plaza that would document the full history of the site. 

In the middle of the site is a lush oasis of trees, walkways, bridges and concrete ponds. Not sure they are in the right location for a contemporary pocket park and they are at the end of their lifespand. 

One of the few building that is still in good shape, unfortunately it is not in a great position. 

There is an simplicity in the minimalist, cubist, industrial architecture of the brewery that could be respected in new buildings.  It is my understanding that the brick chimney will be preserved. It is kinda the Calgary Tower of Inglewood - should it remain the tallest structure in the community forever? 

There is a nice juxtaposition of the round and the rectangular shapes at IBD. 

This image illustrates how all of the building are interconnected, but each with different foundations and structures that makes restoration a nightmare. 

The interior spaces are very dramatic, but don't lend themselves to easy conversion to retail, office or residential uses. 

Some of the newer building from 1984 were never used and are actually overbuilt for future needs and have potential for adaptive reuse. 

Last Word

After walking around the site, I have a much better appreciation of the difficulties and complexities of redeveloping the site for modern uses - this is not a Currie Barracks, an East Village or a Bridges site. 

Rather than let the buildings further deteriorate and have a prominent site sit in limbo for another decade or more, the idea of developing the site incrementally starting with the Bottling Plant building as proposed by Stan’s team makes sense.  Great spaces and places happen organically, not systematically.

Though, some have suggested the need for a Master Plan before anything happens on the site, I disagree. We don’t want another “East Village” scenario (i.e. a new Master Plan developed every five to ten years with nothing happen for 30+ years).  Master Plans tend to all look the same anyway; I expect we will get something more unique and eclectic without a Master Plan.

 Jane Jacobs was also a big fan of incremental redevelopment rather than revolutionary redevelopment. I think she would have approved of starting by animating the 9th Avenue and 15th Street corner (across from the West Canadian Digital Print Centre) with some street retail like a ZYN wine and spirits store and warehouse. 

The Bottling Plant on the corner of 9th Avenue and 15th Street SE is being proposed as Phase 1 of the mega makeover of the Inglewood Brewery District. Different options for the restoration of the sign are being looked at. This is not the original sign.

This is a conceptual rendering of what the Bottling Plant and new streetscape will look like if Phase 1 is approved. 

This is the proposed site of the new BRT/ LRT station for Inglewood and Ramsay just two blocks from the Brewery District.  It will also link up with the 17th Avenue SE BRT route to create a major transit hub. The stars are beginning to align for two of Calgary's oldest communities.